Notice: Undefined index: group_show in /home/www/html/en.liang360.net/html/wap/know.inc.php on line 66 LED production process|Know|en.liang360.net|Powered By Destoon
Home Know Refresh Back Log in
LED production process
Date:2011-04-13 15:17
Status:Be resolved
Question:admin
General requirements: a. purpose b. scope of usec. use of equipmentd,documentse. operating standardsf, notesg. quality requirements
First step:stent rowBefore the step: expanding crystalTemperature: 50-60 degrees Celsius, warm-up about ten minutes,when expand the temperature is set to 65-75 degrees Celsius.
Second step:. point glue
Adjust time of point glue 0.2-0.4 seconds ;Barometer knob 0.05-0.52mPa;adjust the dispensing knob resorted to plastic standard
Remove the plastic from refrigerator,
Best answer:
No best answer
[All answers(0)] [Let me answer]
1/4 Next Pre Home page Last page

Know


Back Refresh WAP Home Web version Login
08/25 13:15