spot light
install or remove power before5. Please use the normal installation6. If damaged, please look for professionals (or service points) maintenance5. Shipment inspection standards5.1 LOT Batch Definition: In principle, the products being manufactured on the same day as a batch (LOT).5.2 The inspection methods and determination standardsNo.Check itemsStandard of acceptanceInspection norms1AppearanceMinor defects AQL 0.65%Serious defects AQL 0.65%Fatal flaw c = 0Common standards with reference to the
6/11 Next Pre Home page Last page
Back
Refresh
WAP Home
Web version
Login
08/26 10:41