panel light
ng the slot into the position of aluminum, the aluminum will be put together without sealing up, lock screws.5, the long put aluminum trough put four small iron wire, and screwed up6, the power light on the back of the fixed panel will be connected with the main line input, and blowing a good thermal control7, the line stretched down rubber joints and lock plate fixed to the ceiling and then down through the extension connectorConnect one end of the main power line terminals8, ready to install p
11/13 Next Pre Home page Last page
Back
Refresh
WAP Home
Web version
Login
08/26 12:15