NTC9240 high power cast light - Xi'an sale
ut, the lighting cable, power cable through the compression nut, respectively, introduced into the ballast tank within the terminal, press lines L1, L2 line, a fixed ground connection, and then tighten the compression nut and tighten the cable ballast box cover. 3, by determining where and how to install the lamps and ballast tank installed. 4, and finally the three-core cable required to connect the other end of the 220V power supply. 5, replace the lamp, with a hex wrench to unscrew the two re
5/12 Next Pre Home page Last page
Back
Refresh
WAP Home
Web version
Login
11/21 21:23